Henry Ernest Dudeney/Puzzles and Curious Problems/234 - Pile Driving

From ProofWiki
Jump to navigation Jump to search

Puzzles and Curious Problems by Henry Ernest Dudeney: $234$

Pile Driving
During some bridge-building operations a pile was being driven into the bed of the river.
A foreman remarked that at high water a quarter of the pile was embedded in the mud,
one-third was under water,
and $17$ feet $6$ inches above water.
What was the length of the pile?


Click here for solution

Sources